2022 - Tilley Road Upstream Repair
Tilley Road (Hwy 121 overflowed) and the LAKE at The Preserve that is the cause of the extreme flooding upstream from Tilley Road. The project will increase Culvert sizes from Tilley Road to 93rd and re-establish Hopkins Ditch to facilitate flow from the area to be annexed by RCW 85.32 action. Also requesting FEMA Grant to remove debris and siltation caused by flooding. (back to Work Projects Page)
Links to more details: Upstream Area Overview Culverts Page